Record outages and interpret availability
Configuration Management enabled, CSM Full and relevant staff permissions. CI and relationship writes require administrator rights; application permissions differ.
An Outage records observed unavailability or degradation. It is separate from Incident work and from potential impact inferred through dependencies. A CI, Service Instance or Offering can supply the relevant measurement scope.
Before you start
Identify the target, period, committed schedule/timezone and applicable availability policy. Check access to the relevant availability controls. Availability policies and support response/resolution targets serve different purposes.
Steps
- Open the availability view for the relevant record and choose the period.
- Check the policy source and intended target. Documented policy precedence is Offering → Service → tenant default.
- Record actual Outage timing, scope and disruption context. Confirm evidence rather than inferring it from ticket creation or the dependency map.
- Review recorded Outages alongside the reported result, considering planned-work treatment, degradation weighting and the committed schedule.
- Investigate overlap, incomplete/open evidence and propagation boundaries before publishing a figure.
- Present the percentage with its target, period, schedule and interpretation limits.
Understand the calculation
Conceptually, availability is 100 × (committed time minus counted downtime) divided by committed time. Do not invent a percentage when committed time is zero or evidence is incomplete.
Recorded descendant CI Outages can participate for particular CI/Instance targets, but fully aggregated Offering availability across all associated Instances is not established. Overlapping Outages may be counted independently. Redundant/quorum descendants are excluded from documented availability propagation.
A calculation-level setting being stored does not guarantee that it controls the reported calculation; the described consumer selects the target. Check the actual scope instead of inferring it from a field name.
Expected result
Availability statements can be traced to observed events and a defined measurement scope, with limitations visible to the reader.
Important behaviour
Incidents do not automatically become Outages. Potential impact does not prove downtime or an SLA breach. A maintenance window alone is not disruption evidence, and the absence of an Outage is not independent proof that the resource was healthy.
